Flocculant Dosing Calculations

Calculate dry-solids loading, active-polymer demand and prepared-solution flow using a trial-selected dose.

Flocculant Dosing Calculations

Selected for your slurry. Manufactured for your project.

A dosing calculation translates a verified trial result into explicit mass and flow units. It does not determine the correct chemical or dose for an unknown sludge.

Product selection

Specifications that inform the right choice

Compare the published grades, then confirm the supplied construction and project requirements in the technical submission.

Illustrative mass balance - not a dose recommendation
Input / resultValue
Feed flow20 m³/h
Dry-solids concentration20 kg/m³
Dry-solids mass flow400 kg/h = 0.4 dry tonnes/h
Assumed trial-selected active dose2 kg active/dry tonne
Calculated active polymer0.8 kg/h
Hypothetical supplied product at 40% active by mass2 kg product/h
Hypothetical prepared solution at 2 g active/L400 L/h
Technical notes and test basis

The dose, active content and prepared concentration are illustrative assumptions only. Use the selected product documentation, representative trials and calibrated delivery. Do not adopt this example as an operating recipe.

From specification to site

Fabrication, QA/QC & African project supply

Use an explicit solids basis

Record feed flow Q in m³/h and dry-solids concentration C in kg/m³. Dry-solids mass flow is Q × C in kg/h. If solids are given as a mass fraction, convert with measured slurry density: C = density × dry-solids fraction. A percentage must have a stated measurement basis.

Separate active polymer from supplied product

For a trial-selected dose D in kg active polymer per dry tonne, active demand is Q × C × D / 1000 in kg/h. Divide by the supplied product active mass fraction to obtain kg product/h. Divide again by product density in kg/L for L product/h.

Prepared solution is a different flow

If the dosing solution contains S g active polymer/L, its required flow is active kg/h × 1000 / S in L/h. Add any dilution water to the water balance. A product concentration stated by mass is not automatically the same as g active/L.

Calibrate against the actual stream

Check delivered chemical mass or volume over time, solution concentration, feed flow and solids. Reassess when the feed changes. Calculated demand is a starting setpoint for a validated programme, not proof of achieved dose or performance.

Flocculant Dosing Calculations

FAQ

Frequently asked questions

Is a fixed percentage dose suitable for every sludge?

No. The selected dose depends on the feed and process. State whether the number means active polymer, supplied product or prepared solution, and whether the reference quantity is wet feed or dry solids.

Why does dosing change when feed solids change?

At the same wet-feed flow, a change in dry-solids concentration changes solids mass flow. A programme specified per dry tonne therefore requires a corresponding active-polymer mass adjustment, subject to trial and operating confirmation.

Discuss your dewatering specification

Send the feed, volume, filtrate target, dimensions, location and programme. We will help define the next step.

WhatsApp

FlowTex • Project support across Africa

How can we help?

Request a guide, discuss your project or ask for product selection and pricing. Tell us what you need below.

Step 1 of 3

Your application

Application and location